Lines Matching refs:its
60 that each task runs for at most its runtime every period, avoiding any
93 - When a SCHED_DEADLINE task executes for an amount of time t, its
103 and cannot be scheduled until its scheduling deadline. The "replenishment
150 The utilization of a real-time task is defined as the ratio between its
151 WCET and its period (or minimum inter-arrival time), and represents
168 between the finishing time of a job and its absolute deadline).
196 to respect its deadline; Task_2 is scheduled immediately after Task_1, hence
197 its response time cannot be larger than 50ms + 10ms = 60ms) even if
235 time t + e + P, after its absolute deadline. The total utilization of the
272 represented by its absolute deadlines d_j = r_j + D described above, while
289 this task, as it is not possible to respect its temporal constraints.
399 its own timing constraints needs, in general, a way of declaring:
522 application, given that you know its pid: